India suspends solar safeguard duty ‘for the time being’

Facebook
Twitter
LinkedIn
Reddit
Email

India’s Ministry of Finance has temporarily deferred its imposition of a 25% safeguard duty on solar cell and module imports in compliance with a stay issued by the High Court of Orissa.

The notification issued on 13 August stated: “It has been decided not to insist on payment of safeguard duty, for the time being.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

“Accordingly, till further direction from the Board, the said goods, namely solar cells whether or not assembled in modules or panels would, in respect of said safeguard duty, be assessed provisionally on furnishing of simple letter of undertaking or bond by the concerned person.”

The Ministry’s announcement of the safeguard duty on 30 July caused widespread confusion since it came immediately after the High Court of Orissa had issued a stay on the imposition of the duty until 20 August. Last week, the Orissa High Court told the Ministry to withdraw its safeguard duty notification by 13 August.

Developers Shapoorji Pallonji, Hero Future Energies and Acme Solar as well as domestic PV module manufacturer Vikram Solar had also all filed new petitions at the Orissa High Court against the safeguard duty since its imposition.

Developers had been concerned about whether projects already bid out or under construction would be issued a pass-through on the duty so they would not have to bear the added costs of the duty. The Ministry of New and Renewable Energy (MNRE) had assured developers that a pass-through would be granted and had itself directed the Ministry of Finance. There were still concerns about how the pass-through would be implemented. In any case, developers will now have a temporary relief from the issue with the duty deferred.

Ali Imran Naqvi, vice president of advisory and engineering firm Gensol Group, recently guest blogged on the potential impacts of the safeguard duty on imports from developed countries as well as China and Malaysia.

Read Next

May 16, 2025
Sungrow has signed a supply agreement with Indian independent power producer (IPP) Juniper Green Energy to provide 835MW of its inverters.
May 15, 2025
Indian solar module manufacturer Vikram Solar has signed a 326.6MW module supply agreement with Gujarat State Electricity Corporation Limited (GSECL) for the Khavda Solar park in Gujarat.
May 6, 2025
The global solar market will continue to slow in 2025 after 2024 saw the total capacity growth rate decrease by over 50%, according to a report from SolarPower Europe (SPE).
May 6, 2025
While other technologies exist, c-Si solar PV technology is the leading candidate for large-scale energy production, writes Radovan Kopecek.
April 24, 2025
Tata Power Renewable Energy has signed a power purchase agreement (PPA) with Tata Motors to build a 131MW wind-solar hybrid energy project.
April 16, 2025
Chinese, Indian and American companies have strengthened their positions atop the solar industry’s EPC rankings, according to Wiki-Solar.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 8, 2025
Asia
OSZAR »